Quality
— EACCertified products
Vargov®Design products are serially certified in the Eurasian Economic Union: EAEU certificates of conformity cover more than 300 LC lighting compositions.
EAC conformity mark
The single conformity mark for products circulating on the Eurasian Economic Union market
300+
LC pieces covered by the certificates
2
serial EAEU certificates of conformity
8
GOST testing standards
2031
certificates valid until 31.05.2031
Serial EAEU certificatesof conformity
Vargov lighting compositions are certified as serial production — the certificate covers every unit of the listed LC pieces, not a single batch. Certificates are valid from 01.06.2026 to 31.05.2031.
Certificate No. 10095925
- TR CU 004/2011 “On the safety of low-voltage equipment”
- TR CU 020/2011 “Electromagnetic compatibility of technical devices”
53+ LC pieces · serial production
Certificate No. 10095927
- TR CU 004/2011 “On the safety of low-voltage equipment”
250+ LC pieces · serial production
Certification body — Test-St. Petersburg LLC, accreditation certificate ROSS RU.0001.10SP28. Certification scheme 1s · serial production. Full certificate texts and annexes listing the LC codes are available on request for tender and project documentation.
Standards
Tested to GOST
Conformity with the technical regulations is confirmed by testing to the national GOST standards.
GOST IEC 60598-1-2017
Luminaires. General requirements and test methods
GOST IEC 60598-2-1-2011
Fixed general-purpose luminaires
GOST IEC 62471-2013
Photobiological safety of lamps and lamp systems
GOST IEC 62493-2014
Assessment of lighting equipment related to human exposure to electromagnetic fields
GOST IEC 61547-2013
EMC. Immunity requirements for lighting equipment
GOST CISPR 15-2014
Radio disturbance limits for lighting equipment
GOST IEC 61000-3-2-2017
EMC. Limits for harmonic current emissions
GOST IEC 61000-3-3-2015
EMC. Limitation of voltage fluctuations and flicker
Documents
Certificates — for your project
We will send the certificates of conformity and the annexes with LC codes for tender documentation and working drawings.